Location

Balıkesir

Type

Wind

Installed Capacity

143 MW

Year of Commissioning

2012

Gold Carbon Certificate

Balıkesir Wind Power Plant has an installed capacity of 143 MW with its 52 turbines and is connected to the TEİAŞ Poyraz and Balıkesir 154 Kv switchyards. Our power plant has an annual generation capacity of 549 GWh. The project was granted the “Carbon Gold Certificate” by The Gold Standard Foundation. BARES hybrid solar power plant, the installed power of Hybrid solar power plant of Bares is 395 kW DC / 330 kW AC and was commissioned in 2021. 918 pieces of solar panels used have PV mono-crystalline technology. The power plant includes 3 Sungrow branded inverters with capacity of 110kW each.
The annual average generation capacity of the power plant is 616 MWh and it was built on 4-decare of land.

Contact

Bursa yolu 20.km Karakaya köyü mevkii Balıkesir

0266 274 50 31
0266 274 50 81
The Nearest Airport
Balıkesir Airport

Power Plants

Power Plant Location Installed Capacity Year of Commissioning
Arkun Dam and HEPP Artvin 245 MW 2014
Çambaşı HEPP Trabzon 44,1 MW 2013
Dağdelen HEPP Kahramanmaraş 8 MW 2013
Doğançay HEPP Adana 62 MW 2017
Hacınınoğlu HEPP Kahramanmaraş 142 MW 2011
Kandil HEPP Kahramanmaraş 208 MW 2013
Kavşak Bendi HEPP Adana 191 MW 2013
Köprü HEPP Adana 156 MW 2013
Kuşaklı HEPP Adana 20 MW 2013
Menge HEPP Adana 89 MW 2011
Sarıgüzel HEPP Kahramanmaraş 103 MW 2013
Yamanlı II HEPP Adana 82 MW 2015
Bandırma I NGCCPP Bandırma 939 MW 2010
Bandırma II NGCCPP Bandırma 607 MW 2016
Kentsa NGCCPP İzmit 40 MW 1997
Tufanbeyli Lignite Power Plant Adana 450 MW 2016
Bandırma SPP Bandırma 2 MW 2017
Karabük SPP Karabük 7 MW 2017
Akhisar WPP Manisa 62 MW 2011
Akköy WPP Akköy 25,2 MW 2023
Aydos WPP İstanbul 14 MW 2021
Balıkesir WPP Balıkesir 143 MW 2012
Çanakkale WPP Çanakkale 29,9 MW 2011
Çeşme WPP Çeşme 18,9 MW 2015
Dağpazarı WPP Mersin 53 MW 2012
Dikili WPP Kocaeli 7,2 MW 2021
Erciyes WPP Kayseri 115 MW 2022
Harmancık WPP Çanakkale 42 MW 2024
Ovacık WPP Çanakkale 54,6 MW 2024
Uygar WPP İzmir 250 MW 2025