Location

Adana

Type

Hydroelectric

Installed Capacity

82 MW

Year of Commissioning

2015

Gold Carbon Certificate

Yamanlı II HEPP, which we commissioned in 2015 and has an installed capacity of 82 MW, is located on the Göksu branch of the Seyhan River within the provincial borders of Adana. Our Yamanlı II Hydroelectric Power Plant has an annual generation capacity of 234 GWh. The project was granted the “Carbon Gold Certificate” by The Gold Standard Foundation.

Contact

Hocabey mah. Karakuyu köyü Saimbeyli/Adana

0322 776 21 63
0322 776 21 45
The Nearest Airport
Kahramanmaraş Airport

Power Plants

Power Plant Location Installed Capacity Year of Commissioning
Arkun Dam and HEPP Artvin 245 MW 2014
Çambaşı HEPP Trabzon 44,1 MW 2013
Dağdelen HEPP Kahramanmaraş 8 MW 2013
Doğançay HEPP Adana 62 MW 2017
Hacınınoğlu HEPP Kahramanmaraş 142 MW 2011
Kandil HEPP Kahramanmaraş 208 MW 2013
Kavşak Bendi HEPP Adana 191 MW 2013
Köprü HEPP Adana 156 MW 2013
Kuşaklı HEPP Adana 20 MW 2013
Menge HEPP Adana 89 MW 2011
Sarıgüzel HEPP Kahramanmaraş 103 MW 2013
Yamanlı II HEPP Adana 82 MW 2015
Bandırma I NGCCPP Bandırma 939 MW 2010
Bandırma II NGCCPP Bandırma 607 MW 2016
Kentsa NGCCPP İzmit 40 MW 1997
Tufanbeyli Lignite Power Plant Adana 450 MW 2016
Bandırma SPP Bandırma 2 MW 2017
Karabük SPP Karabük 7 MW 2017
Akhisar WPP Manisa 62 MW 2011
Akköy WPP Akköy 25,2 MW 2023
Aydos WPP İstanbul 14 MW 2021
Balıkesir WPP Balıkesir 143 MW 2012
Çanakkale WPP Çanakkale 29,9 MW 2011
Çeşme WPP Çeşme 18,9 MW 2015
Dağpazarı WPP Mersin 53 MW 2012
Dikili WPP Kocaeli 7,2 MW 2021
Erciyes WPP Kayseri 115 MW 2022
Harmancık WPP Çanakkale 42 MW 2024
Ovacık WPP Çanakkale 54,6 MW 2024
Uygar WPP İzmir 250 MW 2025