Location

Kayseri

Type

Wind

Installed Capacity

78,6 MW

Year of Commissioning

2022

Erciyes Wind Power Plant, which we commissioned on October 21, 2022 by an investment of US$70 million, is located in Yahyalı region of Kayseri and has an annual generation capacity of 221 GWh with an installed capacity of 78,6 MW and 12 Nordex N163-5.7 model turbines that have the largest rotor diameter in Turkey.

Erciyes WPP is connected to the 154 kV Çamlıca 1 HEPP TM-Yeşihisar TM Energy Transmission Line. The capacity of the power plant will be increased to 100 MW with wind capacity increase and solar hybrid investments.

Contact

Yenice mah. 90.sok. No:24 Yahyalı/Kayseri

0352 611 34 38
The Nearest Airport
Kayseri Airport

Power Plants

Power Plant Location Installed Capacity Year of Commissioning
Arkun Dam and HEPP Artvin 245 MW 2014
Çambaşı HEPP Trabzon 44,1 MW 2013
Dağdelen HEPP Kahramanmaraş 8 MW 2013
Doğançay HEPP Adana 62 MW 2017
Hacınınoğlu HEPP Kahramanmaraş 142 MW 2011
Kandil HEPP Kahramanmaraş 208 MW 2013
Kavşak Bendi HEPP Adana 191 MW 2013
Köprü HEPP Adana 156 MW 2013
Kuşaklı HEPP Adana 20 MW 2013
Menge HEPP Adana 89 MW 2011
Sarıgüzel HEPP Kahramanmaraş 103 MW 2013
Yamanlı II HEPP Adana 82 MW 2015
Balıkesir WPP Balıkesir 143 MW 2012
Çanakkale WPP Çanakkale 29,9 MW 2011
Dağpazarı WPP Mersin 39 MW 2012
Erciyes WPP Kayseri 78,6 MW 2022
Bandırma SPP Balıkesir 2 MW 2017
Karabük SPP Karabük 7 MW 2017
Bandırma I NGCCPP Balıkesir 936 MW 2010
Bandırma II NGCCPP Balıkesir 607 MW 2016
Kentsa NGCCPP İzmit 40 MW 1997
Tufanbeyli Lignite Power Plant Adana 450 MW 2016